Pressler Engineering provides consultation, on an as needed basis, to the owner and facilities manager of Safeco Field.  Example projects:

 

Building Drainage Improvements - storm drainage improvements to the home team clubhouse to mitigate rain water flooding to the Clubhouse areas when the roof is open and there is a heavy rain storm. This work was completed in 2008, and to date there have been no new Clubhouse flooding events.

 

Kobe Grill Ventilation Study - a pre-test of the Kobe Grill ventilation system to determine current operating characteristics to help quantify the system upgrades, and methods of improving the Kobe Grill Ventilation system to help control migrating smoke and odor from grill cooking operations.

 

Sewer Fixture Count Documentation - provided existing sewer line building plumbing fixture unit calculations to establish empirically the sewer line inadequacies that plagued Safeco Field from the day the building opened.

 

Safe Sewer System Improvement Study - participated in sewer line camera studies to identify weaknesses, restrictions, and settlement problems in the existing underground main sewer lines. Located problem areas/pipes on as-built underground sewer drawings for future reference, and repair.

 

Safeco Field - Sewer Line Design - provided design drawings and documentation for a new 8” relief sewer line and connection to existing main sewer line in the street at Royal Brougham Way.

 

Safeco Field Pantry Pizza Vent - provided Permit level MEP documents for adding a pizza oven, and a pizza oven hood.

                     

Safeco Field - Press Box Lounge Type 1 Hood Study - studied the feasibility of adding a Type 1 hood to the Press Box Lounge at Safeco Field.

 

UR-1 Sky Bridge Lighting - designed replacement lighting for the Sky Bridge, where original lighting was corroded and failing.

 

UR-2 Security Entrance/Players Walkway Drain - designed a new security entrance drainage system to control migrating rain water from a critical sidewalk used for player’s entrance to the Stadium.

 

UR-10 Concession Roof Precipitators - studied the feasibility and cost of adding precipitators to several concession cooking exhaust systems.

 

Smaller projects include:

-Sewage Ejector Pumps/Security Area

-Cable Pit Drainage Design

-Scoreboard Fire Sprinkler, and additional ventilation.

-a new fire line into Central Plant for fire sprinkler extension.

-design of HVAC improvements to the Hit-It-Here Café.